0731 2518148, 0731- 4108138
[email protected]
Facebook
Twitter
Google+
mptmamptma
  • Home
  • Profile
    • Background
    • Existing Office Bearers
    • Chairmen
    • Managing Committee
    • Commercial Details
    • Important Website1
  • Statistics
    • Growth of Textile Industry in India
    • Cotton
      • Cotton: Country
      • Cotton: State
    • Man Made Fibre
      • Man Made Fibre: Country
      • Man Made Fibre: State
    • Production of Spun Yarn
      • Yarn Country
      • Yarn State
    • Production Of Fabric
      • Production of Fabric: Country
      • Production of Fabric: State
    • Import
      • Import Productwise, Country
    • Export
      • Export: Countrywise
      • Export Productwise: Country
      • Export From State: Productwise
    • Power Tariff
    • Minimum Wages
  • Policies
    • TUFS
    • State Policy
  • Picture Gallery
  • Newsletters
  • Member Login

Power Tariff

Home Power Tariff
S.No.Item
(2)
2016-17
(4)
2017-18
(4)
2018-19
1Fixed Charge(Rs./KVA of Billing Demand)
11 KV Supply
33 KV Supply
132 KV Supply
220 KV / 400 KV Supply
Rs. 300.00
Rs. 470.00
Rs. 560.00
Rs. 590.00
Rs. 330.00
Rs. 510.00
Rs. 610.00
Rs. 620.00
Rs. 330.00
Rs. 510.00
Rs. 610.00
Rs. 620.00
2Energy Charges (Rs./Unit)
11 KV Supply
33 KV Supply
132 KV Supply
220 KV / 400 KV Supply
Upto 50% LF - In Excess of 50% LF
Rs. 6.20 -------- Rs. 5.55
Rs. 6.10 -------- Rs. 5.10
Rs. 5.70 -------- Rs. 4.85
Rs. 5.45 -------- Rs. 4.65
Upto 50% LF - In Excess of 50% LF
Rs. 6.60 -------- Rs. 6.00
Rs. 6.50 -------- Rs. 5.50
Rs. 6.05 -------- Rs. 5.25
Rs. 5.65 -------- Rs. 5.00
Upto 50% LF - In Excess of 50% LF
Rs. 6.60 -------- Rs. 6.00
Rs. 6.50 -------- Rs. 5.50
Rs. 6.05 -------- Rs. 5.25
Rs. 5.65 -------- Rs. 5.00
3Power Factor Incentive
Above --- Upto
95% ------- 96%
96% ------- 97%
97% ------- 98%
98% ------- 99%
99%
1% of EC
2%
3%
5%
7%
1% of EC
2%
3%
5%
7%
5Power Factor Penalty
For each 1% Decrease in average monthly power factor
Below 90%
Below 85%
Below 70%
1% on EC for each 1% fall
5% + 2% for each 1% fall
Disconnection
1% on EC for each 1% fall
5% + 2% for each 1% fall
Disconnection
1% on EC for each 1% fall
5% + 2% for each 1% fall
Disconnection
5Load Factor Incentive
LF < = 75%
LF > = 75%
No incentive
0.10% for every 1% increase
in LF above75% on EC for
incremental consumption
above 75% L.F.
No incentive
No incentive
6Annual Minimum Consumption
11 KV / 33 KV Supply
132 KV / 220 KV Supply
1200 Unit / KVA
1800 Unit / KVA
1200 Unit / KVA
1800 Unit / KVA
1200 Unit / KVA
1800 Unit / KVA
7Billing DemandActual Maximum KVA or 90% of
CD whichever is higher
Actual Maximum KVA or 90% of CD whichever is higherActual Maximum KVA or 90% of CD whichever is higher
8Load factor calculation(Monthly Cons. X 100)/
(No. of Hrs. in Billing
Month X Demand X P.F)
(Monthly Cons. X 100)/
(No. of Hrs. in Billing
Month X Demand(KVA) X P.F)
(Monthly Cons. X 100)/
(No. of Hrs. in Billing
Month X Demand(KVA) X P.F)
9Time of Day Surcharge / Rebate
6 PM to 10 PM Surcharge
10 PM to 6 AM Rebate
Normal Rate of E.C.
20% of Normal E.C.
Normal Rate of E.C.
20% of Normal E.C.
Normal Rate of E.C.
20% of Normal E.C.
10For Excess Demand:
a) Energy Charges
b) Fixed Charges
No Extra Charge
(i) 1.30 times the charges
for demand over 105%
of CD when MD is upto 125%
(ii)2.00 times the charges (when MD exceeds 125%)for demand recorded over and above
25% of CD in addition to (i) above.
No Extra Charge
(i) 1.30 times the charges
for demand over 115%
of CD when MD is upto 130%
(ii)2.00 times the charges (when MD exceeds 130%)for demand recorded over and above
30% of CD in addition to (i) above.
No Extra Charge
(i) 1.30 times the charges
for demand over 15%
of CD when MD is upto 130%
(ii)2.00 times the charges (when MD exceeds 130%)for demand recorded over and above
30% of CD in addition to (i) above.

Contact Us

Jall Sabhagraha, 56/1, South Tukoganj, Indore – 452001
0731 2518148, 0731- 4108138
[email protected]

Quick Links

  • Home
  • About Us
  • Press
  • Important Website

Social Network

Facebook
Twitter
Google+
Copyright © 2017. MPTMA All rights reserved